|
|
|
Sampling and monitoring has been performed at the
site for various investigations for several years. The current sampling
and monitoring effort is being performed by AdrianBrown in
preparation of the Engineering Evaluation/Cost Analysis for the site
that is required by the EPA. The sampling and monitoring is funded by
B&B Mines which owns the site.
|
| For questions or comments, send e-mail to: Adrian Brown |